top of page
Work located in the locality of Parede, Cascais Council, the terrace was insulated with liquid polyurethane,  replaced the flooring, due to infiltrations, due  to poor execution From the placement of the material in the construction of the building, there were no joints between the tiles, preventing them from expanding and contracting, making them loosen from the screed, opening cracks in the old insulation._cc781905-5cde-3194 -bb3b-136bad5cf58d_
IMG_20190830_135826.jpg
IMG_20191021_092104.jpg
IMG_20191023_111149.jpg
IMG_20191023_111159.jpg
IMG_20191023_112759.jpg
IMG_20191024_123555.jpg
IMG_20191106_162919.jpg
IMG_20191106_163134.jpg
IMG_20191106_163513.jpg
IMG_20191106_163636.jpg
IMG_20191106_163700.jpg
IMG_20191021_093720.jpg
IMG_20191021_092111.jpg
IMG_20191023_111202.jpg
IMG_20191023_112007.jpg
IMG_20191024_123542.jpg
IMG_20191024_140653.jpg
IMG_20191024_140657.jpg
IMG_20191106_162933.jpg
IMG_20191106_163621.jpg
IMG_20191106_163627.jpg
IMG_20191106_163641.jpg
IMG_20191106_163650.jpg
bottom of page